The GST annual return (GSTR-9) and the reconciliation statement (GSTR-9C) for FY 2025-26 are due on 31 December 2026. Both forms went live on the GST portal on 8 October 2026, but only for taxpayers who have filed every GSTR-1, GSTR-1A, IFF and GSTR-3B for the year. Once you submit GSTR-9, you cannot revise it, so whatever goes in on the first attempt stays on record.

This year is harder than usual. The 22 September 2025 rate change, the retrospective Section 17(5)(d) amendment, new Table 7 rows, and the Table 6A1 split for prior-year ITC all change how the return is filled. This guide explains each table in plain language, based on the ICAI Technical Guides (November 2026 editions). At the end you can download our free 18-page Staff Pre-Read that we use to train our own team.

📥 Free download: GSTR-9 & GSTR-9C Staff Pre-Read (FY 2025-26)

18 pages, Hinglish, table-by-table. Includes the ITC decision matrix, the 12-step software entry checklist and the red-flag list. Made for the person entering data in the GST software.

Download the PDF (free)

GSTR-9 & 9C FY 2025-26: key facts

  • Due date: 31 December 2026 (both forms)
  • GSTR-9: mandatory if PAN-level aggregate turnover is above ₹2 crore (up to ₹2 crore is exempt, Notification 15/2025-CT)
  • GSTR-9C: mandatory above ₹5 crore; self-certified, no CA certificate needed
  • Revision: not allowed once filed
  • Time bar: no annual return can be filed after 3 years from the due date (Section 44(2)), enforced on the portal
  • Part V window: FY 2025-26 transactions reported in April to October 2026 returns, filed by 30 November 2026
  • Latest form amendment: Notification 05/2026-CT dated 26 October 2026; last year’s optional tables stay optional

In this article: Who must file · What’s new this year · Data checklist · Tables 4 & 5 · Tables 6, 7, 8 (ITC) · ITC decision matrix · Table 9 · Tables 10–14 · Tables 15–19 · Late fee · GSTR-9C · Red flags · FAQs · Sources

Who must file GSTR-9 and GSTR-9C for FY 2025-26

PAN-level aggregate turnover What to file Basis
Up to ₹2 croreExempt from GSTR-9Notification 15/2025-CT
Above ₹2 crore up to ₹5 croreGSTR-9 for every GSTIN (NIL return for inactive GSTINs too)Section 44(1)
Above ₹5 croreGSTR-9 + GSTR-9C for every GSTIN; 9C always after GSTR-9Rule 80(3)

The turnover test is on the PAN-India total, not state-wise. If a business has three GSTINs and the PAN total crosses ₹2 crore, all three must file GSTR-9, even a GSTIN that had no transactions.

What’s new in GSTR-9 for FY 2025-26

  • Edited figures show in red. If you change an auto-populated outward supply figure in Table 4 or 5, the portal highlights that row in red. Keep a written reason for every red row in your working file.
  • Table 17 (HSN outward) is auto-populated from Table 12 of GSTR-1/1A. The portal offers a “Download Table 12 of GSTR-1/1A HSN Details” Excel that includes a Table 17 format sheet.
  • Rate change from 22 September 2025 (56th GST Council). The same HSN sold before and after 22 September goes in separate rate-wise rows.
  • New column in the Table 8A Excel: “Actual ITC amount considered for 8A Summary computation”. Use this amount, not the gross invoice value.
  • Local delivery through e-commerce (Section 9(5)) is now the e-commerce operator’s liability. The operator reports it in Table 4G1; the supplier reports it in Table 5C1.
  • Individual life and health insurance became exempt, so insurers must recheck exempt turnover and common-credit reversal.
  • Section 17(5)(d) amendment (“plant and machinery”, retrospective from 1 July 2017) overrides the Safari Retreats judgment. ITC taken on building construction must be reviewed; any reversal goes in Table 7E.
  • Pan masala and tobacco: 40% rate from 22 September 2025, and from 1 February 2026 RSP-based valuation (Rule 31D) with cess at NIL. These clients have three different bases within one year, so Tables 9 and 17 need care.
  • Post-sale discounts (Circular 251/08/2025): a financial or commercial credit note without GST does not reduce the supplier’s liability, and the recipient does not need to reverse ITC.

Before you file: data checklist

The ICAI guide is clear that the books of accounts are the primary source for GSTR-9 (Section 35 and Rule 56). Returns are used to validate the books, not replace them. Collect these first:

From the GST portal:

  • GSTR-1 / IFF / GSTR-1A for April 2025 to March 2026, plus April to October 2026 amendments (for Tables 9, 10, 11)
  • GSTR-3B for April 2025 to March 2026, and April to October 2026 returns filed by 30 November 2026 (for Tables 6A1, 8C, 12, 13)
  • Table 8A document-wise Excel from the GSTR-9 dashboard
  • “Download Table 12 of GSTR-1/1A HSN Details” Excel (for Table 17)
  • Electronic cash, credit and liability ledgers (for interest, late fee and DRC-03 in Table 9)
  • ICEGATE import data (Table 8G) and shipping bill status (exports on payment)
  • Last year’s filed GSTR-9 (FY 2024-25 Tables 8C and 13 for reference)

From the client’s books:

  • Sales, purchase and debit/credit note registers
  • Advance register, RCM register, export/SEZ register (LUT, BRC/FIRC, SEZ endorsement)
  • Fixed asset sales with Section 18(6) value (not the profit or loss figure shown in P&L)
  • ITC reversal working: Rule 37 (180-day payment), Rule 37A, Rules 42/43 (common credit), Section 17(5) blocked credit
  • Refund and demand orders, purchases from composition suppliers, job-work and approval goods details
  • Audited financials and trial balance (needed for 9C if turnover is above ₹5 crore)

First check: match turnover and ITC in the books with GSTR-1 and GSTR-3B, and list every difference before entering anything in the software. A difference cannot be hidden: it goes in Part V (Tables 10–14), is paid through DRC-03, or is explained in 9C.

Part II: Tables 4 and 5 (outward supplies)

Table 4 holds supplies on which tax is payable; Table 5 holds supplies on which tax is not payable. Both auto-populate from GSTR-1, IFF and 1A. The most important rule for Tables 4 to 7: only FY 2025-26 transactions go here. FY 2025-26 entries made in April–October 2026 returns go to Part V.

Table What goes in Watch out
4AB2C supplies, net of notes and amendmentsB2C sales through e-commerce also go here
4BB2B suppliesGross amount; credit notes go in 4I
4C / 4DExports / SEZ supplies with payment of taxLUT exports go to 5A, not here
4FAdvances taxed, invoice not yet issuedMatch with advance register
4GInward supplies under RCMFrom 3B Table 3.1(d)
4G1Section 9(5) suppliesOnly the e-commerce operator fills this
4I–4LCredit notes, debit notes, amendmentsOnly notes with GST; not commercial credit notes
5A / 5BExports / SEZ without payment (LUT/bond)If there was no LUT, escalate (Circular 37/11/2018)
5C / 5C1Outward supplies where recipient pays RCM / Section 9(5) supplies reported by supplierLocal e-commerce delivery now in 5C1
5D–5FExempt, nil-rated, non-GST5D and 5E optional; can be combined in 5D

Common mistakes: putting exempt or non-GST supplies in Table 4; putting outward RCM supplies in Table 4 instead of 5C; forgetting fixed asset sales; editing auto-populated figures without a reason; and mixing old-rate and new-rate data for clients affected by the 22 September 2025 change.

Part III: Tables 6, 7 and 8 (input tax credit)

Most errors happen in ITC. One line to remember: Tables 6 and 7 hold only FY 2025-26 ITC. Prior-year ITC claimed this year is shown separately in Table 6A1.

Table 6 maths: 6A (total ITC in GSTR-3B) − 6A1 (prior-year ITC claimed this year) = 6A2 (net current-year ITC) = 6B to 6H.
6J = 6I − 6A2 must be zero. If it isn’t, an entry is wrong.

Table 6: ITC availed

  • 6A is auto-populated from 3B Table 4A and cannot be edited. It includes prior-year ITC.
  • 6A1 is entered manually: FY 2024-25 ITC claimed in FY 2025-26 3B. Rule 37/37A reclaims do not go here.
  • 6B–6E: FY 2025-26 ITC on domestic purchases, RCM and imports. The inputs/capital goods/services break-up in 6B–6D is optional; the total is required.
  • 6H: Rule 37/37A reclaims always go here, whichever year the ITC belongs to.
  • 6M: ITC through ITC-01, ITC-02, ITC-02A. TRAN-1/TRAN-2 credit does not go here.

Table 7: ITC reversals

From this year, every reversal must go in its own row. Lumping everything into 7H is no longer allowed.

Row Reason for reversal
7ARule 37: supplier not paid within 180 days
7A1 (new)Rule 37A: supplier did not file GSTR-3B
7A2 (new)Rule 38: 50% reversal by banks / NBFCs
7BRule 39: ISD credit note
7C, 7DRules 42, 43: common credit (inputs, capital goods)
7ESection 17(5) blocked credit, including the plant and machinery amendment
7F, 7GTRAN-1, TRAN-2 reversal
7HOthers, such as ITC-03

Reverse only ITC that was claimed in 6B/6H, otherwise it becomes a double reversal. A reversal in FY 2025-26 of FY 2024-25 ITC is not reported anywhere in this GSTR-9 (GSTN Additional FAQ 5). If ineligible ITC was claimed and utilised, pay it through DRC-03 in cash, with interest.

Table 8: GSTR-2B vs GSTR-3B reconciliation

  • 8A is auto-populated from GSTR-2B Table 3(I) and cannot be edited. Use the “Actual ITC amount considered” column in the Excel.
  • 8B equals Table 6B (it is no longer linked to 6H).
  • 8C: FY 2025-26 ITC claimed for the first time in April–October 2026 3B. Reclaims do not go here.
  • 8D = 8A − (8B + 8C). Positive or zero is fine. Negative is a red flag: you claimed more than 2B shows. Common causes: supplier didn’t file GSTR-1, ITC claimed twice, a typing error, or next year’s reclaim wrongly put in 8C (GSTN FAQ 16).
  • 8G, 8H, 8H1: import IGST paid, claimed this year, and claimed next year (8H1 is new). 8I = 8G − (8H + 8H1).

ITC decision matrix: which credit goes where

Situation GSTR-9 FY 2025-26 GSTR-9 FY 2026-27
FY 25-26 invoice, ITC taken in FY 25-266B—
FY 24-25 invoice, first claimed in FY 25-26 3B6A1—
FY 24-25 ITC reversed in FY 24-25, reclaimed in FY 25-26 (not Rule 37/37A)6A1—
FY 24-25 ITC reversed in FY 24-25, reclaimed in FY 25-26 (Rule 37/37A)6H—
Claimed, reversed and reclaimed all in FY 25-266B, Table 7, 6H—
Claimed and reversed in FY 25-26, reclaimed in FY 26-27 (not Rule 37/37A)6B, 7H, Table 13 (not 8C)6A1
Claimed and reversed in FY 25-26, reclaimed in FY 26-27 (Rule 37/37A)6B, 7A/7A1 (not 8C or 13)6H
FY 25-26 invoice missed, first claimed in April–October 20268C and Table 136A1
Import in FY 25-26, IGST credit taken in FY 26-278G, 8H1, Table 13—

Source: ICAI Technical Guide on GSTR-9 (Nov 2026), Part B para 4; GSTN FAQs for FY 2024-25 (Q19, Q24); GSTN advisory dated 09.12.2024.

Part IV: Table 9 (tax payable and paid)

  • The tax payable column auto-populates from 3B Table 6.1 but is editable. Enter the tax that is actually payable; don’t repeat a 3B mistake.
  • Tax paid is only what was paid through 3B. If less was paid, pay the difference through DRC-03 before filing GSTR-9.
  • Tax shortfall in DRC-03 can be paid from the cash or credit ledger, but interest, late fee and penalty only in cash. Reversal of utilised ineligible ITC is also paid in cash.
  • Take interest and late fee from 3B Tables 5.1/6.1 and cross-check with the liability ledger. Penalties and other dues come from the ledger and DRC-03 challans.

Part V: Tables 10 to 14 (FY 2025-26 items reported next year)

Part V holds FY 2025-26 transactions reported in April to October 2026 returns that were filed by 30 November 2026. Anything filed after that does not count.

  • Table 10: upward amendments: missed invoices, debit notes
  • Table 11: downward amendments: credit notes
  • Table 12: FY 2025-26 ITC reversed in FY 2026-27 (3B Table 4B)
  • Table 13: FY 2025-26 ITC claimed in FY 2026-27 (8C amount + non-Rule 37 reclaims + 8H1 imports)
  • Table 14: differential tax payable and paid due to Tables 10 and 11

Every 8C amount must also be in Table 13, but not the other way round. Rule 37/37A reclaims do not go in Table 13; they go in next year’s 6H. FY 2024-25 RCM paid in FY 2025-26 3B is shown in the FY 2025-26 GSTR-9, the year of payment (GSTN Additional FAQ 1).

Part VI: Tables 15 to 19

Table Content FY 2025-26 status
15A–15GRefunds and demandsOptional
16A–16CComposition purchases, job-work deemed supply, approval goodsOptional
17HSN-wise outward summaryMandatory. 6-digit HSN above ₹5 crore; 4-digit for B2B up to ₹5 crore
18HSN-wise inward summaryOptional
19Late fee payable and paidSystem-calculated on late filing

For Table 17, if an HSN’s rate changed on 22 September 2025, create two rows: one at the old rate, one at the new rate. The 65% concessional rate checkbox has been removed. And remember: optional does not mean you can report wrong data. If you fill an optional table, fill it correctly.

Late fee for GSTR-9 and GSTR-9C

Aggregate turnover Late fee per day (CGST + SGST) Maximum
Up to ₹5 crore₹50 (₹25 + ₹25)0.04% of turnover in the state
₹5 crore to ₹20 crore₹100 (₹50 + ₹50)0.04% of turnover in the state
Above ₹20 crore₹200 (₹100 + ₹100)0.5% of turnover in the state

Basis: Section 47(2), Notification 07/2023-CT.

GSTR-9 on time but 9C late? Late fee still applies. Under Circular 246/03/2025-GST, the annual return is complete only when both forms are filed. For 9C, late fee runs from the later of the GSTR-9 filing date and the due date, until 9C is filed, and is shown in Table 17 of GSTR-9C. Example: GSTR-9 filed on 25 December, 9C filed on 7 January = 7 days of late fee.

GSTR-9C: for turnover above ₹5 crore

GSTR-9C reconciles the audited books with GSTR-9 on three things: turnover, tax paid and ITC. It is self-certified, so no CA certificate is needed, but every difference needs a reason. 9C is always filed after GSTR-9.

  • Part II (Tables 5–8): turnover. Audited turnover vs GSTR-9 turnover. Adjustments in 5B–5N (unbilled revenue, advances, credit notes, deemed supply) can be shown together in 5O.
  • Part III (Tables 9–11): tax paid. Rate-wise tax payable vs paid. Short payment goes in Table 11 and is paid through DRC-03.
  • Part IV (Tables 12–14): ITC. Books (12A) vs GSTR-9 Table 7J (12E). Difference in 12F, reason in Table 13. Table 14 (expense-wise ITC) is optional.
  • Tables 16–17: additional liability and late fee.

Multi-GSTIN businesses: if the PAN total is above ₹5 crore, each GSTIN files its own 9C. Derive audited figures GSTIN-wise from branch books, and include branch transfers and cross-charges (Schedule I supplies between distinct persons). Turnover includes taxable, exempt, export/SEZ, deemed export, outward RCM supplies and advances received; it excludes inward RCM and the GST amount itself.

Red flags: stop and review before filing

If you see any of these, don’t file until it is reviewed:

  • Table 6J is not zero
  • Table 8D is negative
  • A red (edited) row in Table 4/5 with no written reason
  • Tax payable is more than tax paid and no DRC-03 has been made
  • Large difference between books and returns
  • ITC taken on building or construction (Section 17(5)(d))
  • Zero-rated supplies without a valid LUT
  • Multiple GSTINs under the PAN, but GSTR-9 not prepared for all of them

The full 12-step software entry checklist is in the pre-read. Download it from the box at the top of this article or the link below.

Get the full 18-page GSTR-9 & 9C Staff Pre-Read (FY 2025-26)

Table-by-table Hinglish summary of the ICAI Technical Guides, with the ITC decision tree, Part V timeline, late fee examples and red-flag checklist.

Download the PDF (free)

Need your GSTR-9 or 9C prepared or reviewed before 31 December? RDT & Associates handles annual returns, ITC reconciliations and 9C for businesses across India. Book a consultation, read more guides on our blog, or follow @thefreelancerca on Instagram for daily GST and income tax updates.

GSTR-9 & 9C FY 2025-26: frequently asked questions

What is the due date for GSTR-9 and GSTR-9C for FY 2025-26?

31 December 2026 for both forms. They were enabled on the portal from 8 October 2026 for taxpayers who have filed all GSTR-1, GSTR-1A, IFF and GSTR-3B returns for the year.

Is GSTR-9 mandatory for turnover below ₹2 crore?

No. Taxpayers with PAN-level aggregate turnover up to ₹2 crore are exempt from filing GSTR-9 for FY 2025-26 under Notification 15/2025-CT.

Who has to file GSTR-9C for FY 2025-26?

Every GSTIN under a PAN whose aggregate turnover is above ₹5 crore. GSTR-9C is self-certified by the taxpayer; a CA certificate is not required.

Can GSTR-9 be revised after filing?

No. GSTR-9 cannot be revised once submitted, so it should be reviewed carefully before filing.

What is Table 6A1 in GSTR-9?

Table 6A1 shows ITC of the previous year (FY 2024-25) that was claimed in the current year’s GSTR-3B. 6A minus 6A1 gives 6A2, the net current-year ITC. Rule 37/37A reclaims go in 6H, not 6A1.

What if Table 8D is negative?

A negative 8D means ITC claimed in 3B is more than what GSTR-2B shows. Common reasons are suppliers not filing GSTR-1, double claims, typing errors, or a reclaim wrongly put in 8C. Prepare an invoice-wise working before filing.

Which returns count for Part V (Tables 10–14)?

FY 2025-26 transactions reported in April to October 2026 returns that were filed on or before 30 November 2026.

What is the late fee for GSTR-9 for FY 2025-26?

₹50 per day up to ₹5 crore turnover, ₹100 per day for ₹5–20 crore, and ₹200 per day above ₹20 crore (CGST + SGST combined), subject to caps of 0.04% or 0.5% of turnover in the state.

Is late fee charged if GSTR-9 is on time but GSTR-9C is late?

Yes. Under Circular 246/03/2025-GST, late fee runs for GSTR-9C from the later of the GSTR-9 filing date and the due date until 9C is filed.

Where can I download the GSTR-9 and 9C pre-read PDF?

Use the download button on this page. It is free, 18 pages, and based on the ICAI Technical Guides (November 2026 editions).

Sources

  • ICAI, Technical Guide on GST Annual Return (Form GSTR-9), 4th edition, November 2026: Part A (key updates), Part B (quick reference), Chapter 11 (table-wise analysis), Chapter 12 (optional entries), Appendices 14.9 and 14.10 (GSTN FAQs)
  • ICAI, Technical Guide on GST Reconciliation Statement (Form GSTR-9C), 3rd edition, November 2026: Chapters 1–3, Appendix 7
  • CGST Act, 2017: Sections 35, 44, 47(2); CGST Rules: Rules 56 and 80
  • Notifications 05/2026-CT, 13/2025-CT, 15/2025-CT, 07/2023-CT; Circulars 246/03/2025-GST and 251/08/2025-GST — cbic-gst.gov.in
  • GSTN advisories and FAQs on GSTR-9/9C — gst.gov.in

Last updated: 26 November 2026. Based on the ICAI Technical Guides (November 2026), notifications and GSTN FAQs as of 25 November 2026. The ICAI guide itself notes that some portal features (red highlighting, Table 17 auto-population, the new 8A Excel column) should be confirmed on the portal at the time of filing. This article is general information, not legal or tax advice. Please check the portal and latest notifications, or speak to a Chartered Accountant, before filing.